Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Ali, A K (2019) A case study in developing an interdisciplinary learning experiment between architecture, building construction, and construction engineering and management education. Engineering, Construction and Architectural Management, 26(09), 2040–59.

Chan, D W, Olawumi, T O and Ho, A M (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(09), 1838–54.

Chen, Y, Yin, Y, Browne, G J and Li, D (2019) Adoption of building information modeling in Chinese construction industry. Engineering, Construction and Architectural Management, 26(09), 1878–98.

Gao, J, Ren, H and Cai, W (2019) Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(09), 2147–68.

Iskandar, K A, Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(09), 2023–39.

Jin, R, Zou, P X, Li, B, Piroozfar, P and Painting, N (2019) Comparisons of students’ perceptions on BIM practice among Australia, China and UK. Engineering, Construction and Architectural Management, 26(09), 1899–923.

Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(09), 2060–83.

Lavikka, R H, Kyrö, R, Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(09), 1946–61.

Lee, C (2019) Financing method for real estate and infrastructure development using Markowitz’s portfolio selection model and the Monte Carlo simulation. Engineering, Construction and Architectural Management, 26(09), 2008–22.

Manu, P, Mahamadu, A, Booth, C, Olomolaiye, P O, Coker, A, Ibrahim, A and Lamond, J (2019) Infrastructure procurement capacity gaps in Nigeria public sector institutions. Engineering, Construction and Architectural Management, 26(09), 1962–85.

Marefat, A, Toosi, H and Mahmoudi Hasankhanlo, R (2019) A BIM approach for construction safety: applications, barriers and solutions. Engineering, Construction and Architectural Management, 26(09), 1855–77.

  • Type: Journal Article
  • Keywords: Barriers; BIM; Solutions; HSE; 4D visualization;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-01-2017-0011
  • Abstract:
    Construction industry bears a lot of casualties and accidents more than other high-risk industries annually. Thus, the use of new technologies such, as building information modeling, automatic rule checking, information technology-based safety systems in order to implement the rules and safety standards, better controls the performance of workers on site and make high coordination between operational executives, leading to create a secure environment in projects by reducing accidents. The paper aims to discuss these issues. Design/methodology/approach In this study, a researcher-designed questionnaire was distributed among 200 companies that are active in the field of construction to evaluate the effect of building information model (BIM) for safety projects and barriers to adoption. Only 70 percent of questionnaires were returned. Statistical Package for the Social Sciences analysis has been used to determine the correlation coefficient among the respondents. Findings The results show the factors that lead to failure in the adoption of BIM in Iran are lack of well-trained personnel, proper social infrastructure, guidance and governmental supports. Originality/value Finally, the authors presented solutions for overcoming barriers and proposed some factors leading to the successful adoption of BIM in Iran.

Nadafi, S, Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(09), 2107–19.

Pantzartzis, E, Price, A and Edum Fotwe, F (2019) Roadmap layers and processes: resilient and sustainable care facilities. Engineering, Construction and Architectural Management, 26(09), 1986–2007.

Panwar, A, Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(09), 1924–45.

Roberts, C, Edwards, D J, Hosseini, M R, Mateo-Garcia, M and Owusu-Manu, D (2019) Post-occupancy evaluation: a review of literature. Engineering, Construction and Architectural Management, 26(09), 2084–106.

Wu, C, Chen, C, Jiang, R, Wu, P, Xu, B and Wang, J (2019) Understanding laborers’ behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(09), 2120–46.